2025 Victoria Street - Official Plan Amendment (D09-2024-001), Zoning By-law Amendment (D14-2024-006) and Draft Plan of Subdivision (D12-2022-001) Applications
Applications for Official Plan Amendment (D09-2024-001), Zoning By-law Amendment (D14-2024-006) and Draft Plan of Subdivision (D12-2022-001) have been received to facilitate a proposed 343 unit residential subdivision consisting of 190 single detached lots, 153 townhouse lots, a stormwater management facility, two public park blocks and a large open space block, and would be accessed by municipal roads with an entrance from Victoria Street and Southview Avenue. The development is proposed to be fully serviced by future municipal water and sanitary services. The applications propose to permit townhouses, allow a maximum permitted density of 25 units per net hectare, and realign the Hazard Land Overlay. The subject lands are proposed to be re-zoned from the current Future Development (FD) and Environmental Protection (EP) Zones to Residential 2 Exception Hold (R2-XX(H)) zone, Residential 3 Exception Hold Zones (R3-XY(H) and R3-XX(H)), Residential Townhouse Exception Hold Zones (RT-XY(H) and RT-XX(H)), Open Space Zone (OS) and Environmental Protection Exception Zone (EP-XX) to facilitate the proposed subdivision.
A Public Meeting has been scheduled for Wednesday, September 18, 2024 to be held in the Council Chambers at 6:00pm. Please see the below link to the Notice of Complete Application and Public Meeting for more information:
Notice of Complete Application and Public Meeting
Supporting Materials:
- Cover Letter
- Draft Official Plan Amendment
- Draft Zoning By-law Amendment
- Draft Plan of Subdivision
- Planning Justification Report
- Public Engagement Strategy
- Placemaking and Urban Design Brief
- Trails Concept Plan
- Environmental Impact Study
- Floodplain Analysis
- Arborist Report
- Tree Inventory and Preservation Plans
- Hydrogeological Assessment
- Noise Impact Study
- Phase 1 Environmental Site Assessment
- Phase 2 Environmental Site Assessment
- Functional Servicing and Stormwater Management Report
- Traffic Impact Study
- Stage 1-2 Archaeological Assessment
- Proof of Archaeological Register
- Preliminary Geotechnical Investigation
- Updated Geotechnical Investigation
- Topographic and Boundary Survey
- Top of Bank Demarcation Mapping
- Parcel Register