Project Background

CLOSED: This discussion has concluded.

A section of Raynor Court has been treated as an unopened road allowance. To date, it has been utilized by residents but not maintained by the Town. In order for the Town’s Operations department to maintain the road to meet minimum maintenance standards, the laneway improvements are essential.

The Town retained an Engineering Consultant to provide consulting services to complete a detailed design and provide contract administration services for the project.

As part of the design process a Neighbourhood Drop-In was held on November 12th, 2019 at Town Hall. Residents local to the project were invited to be introduced to the design team, project drawings, and in return provide any questions or comments on the project.

To stay in the loop about this project, check back here or Follow the Project for updates.

Share Project Background on Facebook Share Project Background on Twitter Share Project Background on Linkedin Email Project Background link

Consultation has concluded

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>